Energy, Utilities, and Mining Solutions

Because energy companies have facilities that are in constant evolution, built from the ground up or refurbished, they need flexible space solutions. Algeco offers all the facilities that are essential to the business of energy companies in the Russian Federation: from storage containers to store equipment, to laboratories, offices, or full-scale workforce housing for staff that typically works under harsh conditions.

Your Needs

Our Solutions

Drill site work space
Field office

Workforce housing, workforce camps
Shelter from inclement weather
Dorms, housing for staff

Multi-section work and living areas to accommodate additional personal and operations

Restrooms and change rooms
Canteen

Modular Buildings

Secure weather-proof storage of tools, equipment and raw materials
Furniture storage

Storage Containers

Toilets, shower and lavatories facilities

Guard booths/houses for high risk environment or secure work areas   

Specialty Products

Total, Oil Field (Usinsk, Komi Republic, Russia)

  • Extra insulated sanitary module with autonomy system for the personnel at oil field.
  • Modules customized for temperature under 45°C.

“Nord Stream” Gas Pipeline (from Vyborg in Russia to Greifswald in Germany), Russian Onshore Pipeline

  • 12 standard modules were used as meeting rooms for the highest-level visitors.
  • Strict interior design and quality of furniture allow using the modules without additional decoration.
  • An Algeco module and a gas pipeline.

Stroytransgaz, Oil Field (Yamal Peninsula, Yamal-Nenets district, Siberia, Russia)

  • Fully equipped buildings with meeting rooms, dormitories, sanitary, canteens, offices. Built to resist to very low temperatures.
  • 2-storeys building built on stilts.

Fortum

  • 26 modules, 2-storeys building (364m²).
  • 29 modules, 3-storeys building (406 m²), including sanitary and shower modules.
  • 30 modules, 2-storeys building (420 m²).
  • 2-storeys office building.
  • 36 modules, 3-storeys building (504 m²).
  • 26 modules, 2-storeys building (364 m²).

Hitachi

  • 2-storeys modular building on construction site, fully equipped.
  • Internal decoration of a modular open-space with all commodities used as a meeting room.
  • 3-storeys combined block of modules for multi-usage premises: offices, meeting rooms, changing rooms.
  • Staircase module combined with standard modules.